BP3 - Replace boiler
19/12/2020
Replacement of current boilers with high-efficiency ones. The project objective is to reduce energy consumption and CO₂ emission.
19/12/2020
Replacement of current boilers with high-efficiency ones. The project objective is to reduce energy consumption and CO₂ emission.
19/12/2020
Replacement of current boilers with environmentally-friendly biomass boilers. The project objective is to reduce energy costs and greenhouse-gas emission.
19/12/2020
Replacement of a coal-fired boiler with a biomass boiler. The project objective is to reduce energy costs and greenhouse gas emission
19/12/2020
BIOMASS FLUIDIZED BED BOILER INVESTMENT PROJECT FOR ENVIRONMENTAL PROTECTION. The project objective is to reduce energy costs and greenhouse gas emission.
19/12/2020
BIOMASS FLUIDIZED BED BOILER INVESTMENT PROJECT FOR ENVIRONMENTAL PROTECTION. The project objective is to reduce energy costs and greenhouse gas emission.
29/12/2020
A textile and dyeing enterprise in Tay Ninh conducted the recovery of condensate from the drying drum of the washing machines. The project objective is to reduce the steam amount consumed by the washing machines, thereby reducing the fuel consumption of the boiler.
30/12/2020
A garment enterprise in Binh Duong province has conducted the insulation of steam valves.
30/12/2020
A garment enterprise in Ho Chi Minh city has installed a solar water heating system for supplying hot water to electric steam boilers. The program objective is to reduce energy costs and greenhouse gas (GHG) emission.
30/12/2020
A textile and dyeing enterprise in Nam Dinh province has implemented solutions to optimize the boiler’s bottom blowdown wastewater. The project objective is to reduce energy costs and greenhouse gas emission.
30/12/2020
A textile and dyeing enterprise in Long An has replaced the old, low-efficiency boiler with a new high-efficiency one
30/12/2020
In response to the energy efficiency program of Adidas brand, a textile and dyeing enterprise in Dong Nai province has carried out the steam system optimization. The program objective is to reduce energy costs and greenhouse gas (GHG) emission.
31/12/2020
A footwear company in Binh Duong Province has installed a solar water heating system for supplying preheated feedwater to the oil-fired boiler. The program objective is to reduce energy costs and greenhouse-gas (GHG) emission.
31/12/2020
In response to an energy efficiency program of Adidas brand, a cloths production enterprise in Soc Trang has implemented energy saving solutions for the electric boiler system. The program objective is to reduce energy costs and greenhouse-gas (GHG) emission
13/01/2021
Replacement of low-efficiency coal-fired boiler with high efficiency biomass-fired boiler
13/01/2021
Optimization of existing boilers’ operation and improvement of the boilers’ wall insulation for energy consumption reduction in Hanoi - Hai Duong Beer Joint Stock Company
13/01/2021
Improving the energy efficiency with combined solutions at Tin Thanh Group's steam factory that supplies steam to Saigon - Cu Chi Brewery
13/01/2021
Optimization of the boiler operation to reduce the energy consumption at NutiFood - Binh Duong
13/01/2021
Replacement of a low-efficiency coal-fired boiler with a high-efficiency biomass boiler at Hoa Sen Steel Co., Ltd. - Binh Duong
13/01/2021
Optimization of existing boiler operation for energy consumption reduction at VINAPAPER Company Limited
13/01/2021
Optimizing the steam system for energy consumption reduction at Vietnam Paper Corporation.
19/12/2020
Replacement of piston refrigeration compressors with screw refrigeration compressors. The project targets to reduce the energy costs and the emission of greenhouse gases.
19/12/2020
An investment project in improving the refrigeration system with many solutions. The project goal is to reduce the energy costs and emission of greenhouse gases.
30/12/2020
An investment project in improving the refrigeration system, with many solutions. The project goal is to reduce energy costs and emission of greenhouse gases.
17/02/2022
Thanks to the investment in modern, energy-saving technology equipment to maximize the operation, Canon Vietnam Co., Ltd - Thang Long Factory has reduced its power consumption by 13.6% from 94,387 MWh in 2016 to 81,607 MWh in 2020.
19/12/2020
A footwear company in Thanh Hoa Province has installed a loop circuit system and reset the operating pressure of the compressor. The goal of the project is to reduce energy costs and greenhouse gas emissions.
19/12/2020
A textile and dyeing enterprise in Tay Ninh Province has installed a variable speed drive (VSD) for the SG90A-90kW screw air compressor. The project aims at reducing the power consumption of the air compressor.
30/12/2020
A footwear manufacturing enterprise in Dong Nai Province has adopted a solution of inlet temperature reduction to air compressor.
30/12/2020
A textile and dyeing enterprise in Nam Dinh Province has implemented a project of installing a variable speed drive (VSD) and central control system for air compressors. The goal of the project is to reduce energy costs and greenhouse gas emissions.
30/12/2020
A garment enterprise in Tay Ninh Province has replaced the old air compressors in LangHam 2 with high efficiency VSD ones.
30/12/2020
In response to the energy efficiency program of Adidas brand, a textile and dyeing enterprise in Tay Ninh Province has implemented the project of pneumatic system improvement. The goal of the project is to reduce energy costs and greenhouse gas emissions.
30/12/2020
In response to the energy efficiency program of Adidas brand, a textile and dyeing enterprise in Dong Nai Province has made improvements of the pneumatic system. The goal of the project is to reduce energy costs and greenhouse gas emissions.
30/12/2020
In response to the energy efficiency program of Adidas brand, a garment enterprise in Hai Phong City has carried out a project of compressed air system improvement. The goal of the project is to reduce energy costs and greenhouse gas emissions.
31/12/2020
In response to the energy efficiency program of Adidas brand, a textile and dyeing enterprise in Soc Trang Province has implemented the project of pneumatic system improvement. The goal of the project is to reduce energy costs and greenhouse gas emissions.
31/12/2020
In response to the energy efficiency program of Adidas brand, a garment enterprise in HCMC has made significant improvements to the lighting system to enhance energy efficiency. The goal of the project is to reduce energy costs and greenhouse gas emissions.
13/01/2021
Installation of inverter for 37kW Hitachi screw air compressors. The project aims at reducing the power consumption of the air compressor.
19/12/2020
A footwear manufacturing enterprise in Thanh Hoa Province has replaced asynchronous motors with servo ones for the sewing machines. The project objective is to reduce energy costs and greenhouse gas emissions.
30/12/2020
A plastic manufacturer in Ho Chi Minh City has installed HES sets for the injection molding machines to reduce power consumption.
30/12/2020
A footwear manufacture company in Binh Duong has replaced the cutting machines' hydraulic motors with servo motors.
30/12/2020
A garment enterprise in Long An has replaced the sewing machines' conventional motors with servomotors, greatly reducing power consumption for the sewing machine system.
30/12/2020
A garment enterprise in Binh Duong Province has replaced T5 compact fluorescent lamps with LEDs.
30/12/2020
A garment enterprise in Long An Province has replaced T5 lamps with energy-saving LED lamps.
30/12/2020
A textile and dyeing enterprise in Long An Province has replaced low-efficient T5 compact fluorescent lamps with high-efficiency LED lamps to save energy for the lighting system.
31/12/2020
In response to an energy-efficiency program of Adidas brand, a garment enterprise in HCMC has made significant improvements to the lighting system to enhance energy efficiency. The goal of the project is to reduce energy costs and greenhouse gas emissions.
30/12/2020
A textile and dyeing enterprise in Long An Province has installed variable speed drive (VSD) for chilled water pumps, reducing pump speed and saving power consumption.
30/12/2020
improvement of ventilation and cooling system for the factory (using ultra-energy-saving fans)
30/12/2020
A textile and dyeing enterprise in Nam Dinh Province implemented a project of installing variable speed drive (VSD) for boilers’ exhaust fans and blowers. The goal of the project is to reduce energy costs and the emission of greenhouse gases.
30/12/2020
A textile and dyeing enterprise in Long An has replaced the belt-driven fans with higher-efficiency direct drive fans.
30/12/2020
A ceramics producing enterprise in Binh Duong Province has installed an variable speed drive (VSD) for the air blowers to reduce the operation frequency of the blower and save the energy consumption of the wastewater treatment system.