BP42 - Optimize steam system
Address: Soc Trang province | |
Name of the Manager: Ashton Chang | |
Project Summary: In response to an energy efficiency program of Adidas brand, a cloths production enterprise in Soc Trang has implemented energy saving solutions for the electric boiler system. The program objective is to reduce energy costs and greenhouse-gas (GHG) emission | |
Year of implementation: 2018 | |
Status before implementation The operating pressure of the factory’s electric boiler system was about 4-6 kgf/cm2, much higher than the demand.
Electric boiler and its operating pressure before implementation In addition, the boiler valves and pipes were not insulated, thereby increasing the heat loss into the surrounding environment.
|
Result The plant has implemented solutions to optimize the steam system by reducing the pressure setting (about 3 bar) and conducting the insulation of current valves and pipes. Pressure after reduction
Insulation of pipes and valves |
Status before implementation The operating pressure of the factory’s electric boiler system was about 4-6 kgf/cm2, much higher than the demand.
Electric boiler and its operating pressure before implementation In addition, the boiler valves and pipes were not insulated, thereby increasing the heat loss into the surrounding environment.
|
|
Result The plant has implemented solutions to optimize the steam system by reducing the pressure setting (about 3 bar) and conducting the insulation of current valves and pipes. Pressure after reduction
Insulation of pipes and valves |
|
Result of the project: | |
Total investment costs: | VND 4.6 Million |
Power saving: | 10,150 kWh/year |
Cost savings: | VND 19.5 Million |
Payback time: | 0.2 year |