BP39 - Improve lighting system

Address: Tan Thuan Export Processing Zone, Ho Chi Minh City
Name of the Manager: Hsu I Yang
Project Summary: In response to an energy-efficiency program of Adidas brand, a garment enterprise in HCMC has made significant improvements to the lighting system to enhance energy efficiency. The goal of the project is to reduce energy costs and greenhouse gas emissions.
Year of implementation: 2018

Status before implementation

Brightness in the office area (1st floor) was very high, at over 700 lux meanwhile the brightness for computer-based typing is required at around 300 lux

 

The area of 3rd floor where sewing machines are located were not in use then, however, the lights in that area were turned on all day.

Result

The factory has made improvements to the lighting system to reduce power consumption such as cutting off the lights in the 1st floor office area, installing CBs for light lines to turn off unused areas on the 3rd floor.

Reduced half of the lights on the 1st floor

Installed CB to turn off the unused lights 

Status before implementation

Brightness in the office area (1st floor) was very high, at over 700 lux meanwhile the brightness for computer-based typing is required at around 300 lux

 

The area of 3rd floor where sewing machines are located were not in use then, however, the lights in that area were turned on all day.

Result

The factory has made improvements to the lighting system to reduce power consumption such as cutting off the lights in the 1st floor office area, installing CBs for light lines to turn off unused areas on the 3rd floor.

Reduced half of the lights on the 1st floor

Installed CB to turn off the unused lights 

Result of the project:
Total investment costs: Low
Power saving: 3,030 kWh/ year
Cost savings: VND 5.6 Million