BP36 - Improve compressed air system
Address: Thuy Nguyen District, Hai Phong City | |
Name of the Manager: Mr. YIU KA SO | |
Project Summary: In response to the energy efficiency program of Adidas brand, a garment enterprise in Hai Phong City has carried out a project of compressed air system improvement. The goal of the project is to reduce energy costs and greenhouse gas emissions. | |
Year of implementation: 2018 | |
Status before implementation The B2 compressor room temperature was quite high compared to the ambient temperature.
The separate compressed air system reduced the overall efficiency of the air compressors.
|
Result Hot air exhaust pipes have been connected to the compressor in B2 zone. After improvement With the compressors in zones A and C, the factory has combined the air compressors into a system and reinstalled operating pressure from 6.5 to 7 bar. |
Status before implementation The B2 compressor room temperature was quite high compared to the ambient temperature.
The separate compressed air system reduced the overall efficiency of the air compressors.
|
|
Result Hot air exhaust pipes have been connected to the compressor in B2 zone. After improvement With the compressors in zones A and C, the factory has combined the air compressors into a system and reinstalled operating pressure from 6.5 to 7 bar. |
|
Result of the project: | |
Total investment costs: | Annual maintenance |
Power saving: | 42,681 kWh/ year |
Cost savings: | VND 73.7 Million |
Payback time: | Immediately |