BP35 - Improve compressed air system

Address: Nhon Trach District, Dong Nai Province
Name of the Manager: Jordan Cheng
Project Summary: In response to the energy efficiency program of Adidas brand, a textile and dyeing enterprise in Dong Nai Province has made improvements of the pneumatic system. The goal of the project is to reduce energy costs and greenhouse gas emissions.
Year of implementation: 2018

Status before implementation

The factories used manual condensate drain valves, causing stagnant water to corrode pipes and joints and damage to the equipment using compressed air; If the drain time is too long, compressed air will be wasted, thereby increasing the power consumption of the air compressor.

 

   Manual drain valve in storage tanks

The air compressor at the dyeing workshop had a pressure set at 6.5 - 7.5 bar, which was high compared to demand. The high pressure setting resulted in reduced compressor efficiency and increased compressed air loss through leak points.

Result

The factory has invested and installed automatic condensate drain valve.

New condensate drain valve

In addition, the factory has reduced the installed pressure of the dyeing mill air compressor to 5 - 6 bar. Savings rate reached about 12%.

Status before implementation

The factories used manual condensate drain valves, causing stagnant water to corrode pipes and joints and damage to the equipment using compressed air; If the drain time is too long, compressed air will be wasted, thereby increasing the power consumption of the air compressor.

 

   Manual drain valve in storage tanks

The air compressor at the dyeing workshop had a pressure set at 6.5 - 7.5 bar, which was high compared to demand. The high pressure setting resulted in reduced compressor efficiency and increased compressed air loss through leak points.

Result

The factory has invested and installed automatic condensate drain valve.

New condensate drain valve

In addition, the factory has reduced the installed pressure of the dyeing mill air compressor to 5 - 6 bar. Savings rate reached about 12%.

Result of the project:
Total investment costs: Low
Power saving: 12,096 kWh/ year
Cost savings: VND 20.6 Million
Payback time: Immediately