BP12 - Improve refrigeration
Company name: VINH NGUYEN PRIVATE ENTERPRISE | |
Address: 709, Dong An Hamlet, Tan Hiep Town, Tan Hiep District, Kien Giang Province | |
Project Summary: An investment project in improving the refrigeration system, with many solutions. The project goal is to reduce energy costs and emission of greenhouse gases. | |
Year of implementation: 2018 | |
Status before implementation Vinh Nguyen Private Enterprise is specialized in ice production with the following main products: Ice blocks, ice cubes. The factory has two (2) systems:
These refrigeration compressors have a long service life, the average COP is about 1.6. Refrigeration compressor Ice block storage In order to save energy, the plant expected to replace 4 existing reciprocating refrigeration compressors with 4 high-efficient reciprocating refrigeration compressors. |
Result The plant has reduced by 25.6% of the total electricity consumption for the ice cube and ice block production system compared to the past. Emission is reduced by 202 tons of CO2/ year Screw refrigeration compressors for ice block production Screw refrigeration compressors for ice cube production |
Status before implementation Vinh Nguyen Private Enterprise is specialized in ice production with the following main products: Ice blocks, ice cubes. The factory has two (2) systems:
These refrigeration compressors have a long service life, the average COP is about 1.6. Refrigeration compressor Ice block storage In order to save energy, the plant expected to replace 4 existing reciprocating refrigeration compressors with 4 high-efficient reciprocating refrigeration compressors. |
|
Result The plant has reduced by 25.6% of the total electricity consumption for the ice cube and ice block production system compared to the past. Emission is reduced by 202 tons of CO2/ year Screw refrigeration compressors for ice block production Screw refrigeration compressors for ice cube production |
|
Result of the project: | |
Total investment costs: | VND 2,107 Million |
Power saving: | 305,184 kWh/ year |
Cost savings: | VND 438 Million |
Payback time: | 4.8 years |