BP9 - Invest new boiler
Company name: THIEN LONG PAPER JOINT STOCK COMPANY | |
Address: Block C1, Tinh An Tay Industrial – Trade village Cluster, Tinh An Tay Commune, Quang Ngai City, Quang Ngai Province. | |
Project Summary: BIOMASS FLUIDIZED BED BOILER INVESTMENT PROJECT FOR ENVIRONMENTAL PROTECTION. The project objective is to reduce energy costs and greenhouse gas emission. | |
Year of implementation: 2017 | |
Status before implementation The main product of the factory is synthetic Kraft paper. During the manufacturing process, steam is fed into the drying rollers for paper drying. The factory's steam system includes:
Existing Boiler Acacia wood For the investment in a new paper corrugating line with a designed capacity of 4,200 tons/year, the factory planned to procure a biomass boiler with a capacity of 6 tons/hour. |
Result The factory intended to invest in:
Investment in a biomass boiler helps save 12% of the energy compared to the existing acacia wood-burning boiler. Biomass boiler with capacity of 6 tons/h Newly installed paper corrugating line |
Status before implementation The main product of the factory is synthetic Kraft paper. During the manufacturing process, steam is fed into the drying rollers for paper drying. The factory's steam system includes:
Existing Boiler Acacia wood For the investment in a new paper corrugating line with a designed capacity of 4,200 tons/year, the factory planned to procure a biomass boiler with a capacity of 6 tons/hour. |
|
Result The factory intended to invest in:
Investment in a biomass boiler helps save 12% of the energy compared to the existing acacia wood-burning boiler. Biomass boiler with capacity of 6 tons/h Newly installed paper corrugating line |
|
Result of the project: | |
Total investment costs: | VND 2,064 Million |
Power saving: | 229 TOE/year |
Cost savings: | VND 2,410 Million |
Payback time: | 0.8 year |