BP8 - Invest new boiler
Company name: SONG NAM PAPER PRODUCTION & TRADING CO., LTD | |
Address: No. 24/9 Tan Hoa Hamlet, Tan Hiep Commune, Hoc Mon District, Ho Chi Minh City | |
Project Summary: BIOMASS FLUIDIZED BED BOILER INVESTMENT PROJECT FOR ENVIRONMENTAL PROTECTION. The project objective is to reduce energy costs and greenhouse gas emission. | |
Year of implementation: 2017 | |
Status before implementation SONG NAM PAPER PRODUCTION & TRADING CO., LTD has a packaging paper factory. During the manufacturing process, steam is fed into the drying rollers for paper drying. The factory's steam system included:
Existing boiler Dust coal For the investment in a new paper corrugating machine line with an initial capacity of 40 tons/day and night, twice as much as the existing boiler (20 tons of paper/day and night), the factory intended to procure a new biomass fluidized bed boiler with capacity of 6 tons/hour. |
Result The factory has invested in:
The project of investing in a new biomass fluidized bed boiler reduces emissions by 100% (2,787 tons of CO2) compared to the existing coal-fired boiler. Biomass fluidized bed boiler with capacity of 6 tons/h Newly installed paper corrugating line |
Status before implementation SONG NAM PAPER PRODUCTION & TRADING CO., LTD has a packaging paper factory. During the manufacturing process, steam is fed into the drying rollers for paper drying. The factory's steam system included:
Existing boiler Dust coal For the investment in a new paper corrugating machine line with an initial capacity of 40 tons/day and night, twice as much as the existing boiler (20 tons of paper/day and night), the factory intended to procure a new biomass fluidized bed boiler with capacity of 6 tons/hour. |
|
Result The factory has invested in:
The project of investing in a new biomass fluidized bed boiler reduces emissions by 100% (2,787 tons of CO2) compared to the existing coal-fired boiler. Biomass fluidized bed boiler with capacity of 6 tons/h Newly installed paper corrugating line |
|
Result of the project: | |
Total investment costs: | VND 3,720 Million |
Power saving: | 119 TOE/year |
Cost savings: | VND 1,535 Million |
Payback time: | 2.5 years |