Checklist

Control of the building

Description Recommendation Maintenance frequency Implementation
Overall visual inspection Complete the overall visual inspection to ensure that all equipment is in good working conditions and safety systems are in the right place Daily  Yes 
Confirm the control schedule Check the control schedule in the software to ensure proper schedule based on the season, occupancy rate, etc. Daily  Yes 
Confirm the setting values Check the software driver for accuracy of settings based on the season, occupancy rate, etc. Daily  Yes 
Hour meters  Restart after each power outage Daily  Yes 
Check all measuring devices Check all gauges to ensure that the readings are correct as required Weekly   Yes 
Controlling pneumatic system  Check for leaks on the piping system  Weekly   Yes 
Check the flow of fresh air Calculate the amount of fresh air and compare it with the standards Weekly   Yes 
Check the setting values Check the setting values and evaluate their rationality Weekly   Yes 
Check the schedule Check the schedule and evaluate its appropriateness Weekly   Yes 
Check the set temperature range  Make sure that the set temperature range is correct and that the current heating/cooling settings are in line with the design. Weekly   Yes 
Check the sensors  Thoroughly check all sensors of temperature, pressure, humidity, flow, etc. for correct values Monthly  Yes 
Hour meters Clean up and check accuracy Monthly  Yes 
Calibrate sensors Calibrate all sensors: temperature, pressure, moisture, flow, etc. Annually  Yes 

Attachments :

Để có thể bình luận, xin vui lòng đăng nhập

Boiler

24/12/2020

Checklist for Boiler

Steam Trap

24/12/2020

Checklist for Steam Trap

Chiller

24/12/2020

Checklist for Chiller

Cooling tower

24/12/2020

Checklist for Cooling tower

Air handling system

24/12/2020

Checklist for Air handling system

Lighting

22/12/2020

Checklist for Lighting