Checklist

Lighting

Description Note Maintenance frequency Implementation
Visual inspection Check the equipment to determine if any light or ballast is not working or is faulty. A burnt-out light can damage the ballast if not replaced. Weekly to monthly  Yes 
Visual inspection Check the equipment and controls for excessive dirt, lens degradation, inoperability, or ineffective control. Every six months  Yes 
Clean lights and appliances Lights and reflective surfaces should be cleaned periodically to provide maximum and effective illumination to the area six (6) to thirty (30) months, depending on area and type of light  Yes 
Clean walls and ceilings A clean surface will allow maximum distribution of light in an area  from one (1) to three (3) years, depending on the contamination of the environment  Yes 
Replacement of lenses and degraded shutters  Replace lenses and shutters when becoming yellow, stained, or faulty As identified  Yes 
Re-paint the walls and replace the ceiling Brighter surface will increase the efficiency of illumination in the area As identified or changed by the tenant  Yes 
Replacement of burnt out  lamps For larger facilities, consider the replacement by cluster of lamps When necessary or as planned for each cluster of lamps  Yes 
Lamp and ballast rating for efficient upgrade solutions Rapid changes in technology can lead to significant savings through replacement of lamps or simple improvement every five (5) years or according to the schedule of replacing the lamps   Yes 
Survey of light usage/illumination levels Measure the luminance and compare it with the standard. Identify areas to increase or decrease the luminance Initial installation and according to the need of the work/replacement by the tenant   Yes 
Survey the possibility for taking advantage of daylight Define areas for installing daylight-based control units One-time analysis or change of tenant    Yes 
Survey the capacity of local control Define areas where automated control units can be used  One-time analysis or change of tenant   Yes 

Attachments :

Để có thể bình luận, xin vui lòng đăng nhập

Boiler

24/12/2020

Checklist for Boiler

Steam Trap

24/12/2020

Checklist for Steam Trap

Chiller

24/12/2020

Checklist for Chiller

Cooling tower

24/12/2020

Checklist for Cooling tower

Air handling system

24/12/2020

Checklist for Air handling system

Control of the building

24/12/2020

Checklist for Control of the building