Checklist

Air handling system

Description Recommendation Maintenance frequency Implementation
Overall visual inspection Complete the overall visual inspection to ensure that all equipment is in good working conditions and safety systems are in the right place Daily  Yes 
Filters Check the filter status according to system type and manufacturer's recommendations Monthly  Yes 
System status Check for leaks at the main connections and AHU door for proper closing. Monthly  Yes 
Expansion valves Check expansion valve driving system and connection level for good operation by adjusting the valve from open position to fully-closed position. Monthly  Yes 
Dust filter Check the status of dust filter. Check the difference of local pressure, status of air supply and return air ducting system  Annually  Yes 
Heat exchanger Check the heat exchanger blades for any distortion and fix any deformed blades. Clean the heat exchanger if there is any large abnormally reducing heat exchange efficiency. Annually  Yes 

Attachments :

Để có thể bình luận, xin vui lòng đăng nhập

Boiler

24/12/2020

Checklist for Boiler

Steam Trap

24/12/2020

Checklist for Steam Trap

Chiller

24/12/2020

Checklist for Chiller

Cooling tower

24/12/2020

Checklist for Cooling tower

Control of the building

24/12/2020

Checklist for Control of the building

Lighting

22/12/2020

Checklist for Lighting